top of page

JJ Civil Solutions Current Project List

Picture of Works
Picture of Works

Latest Job on JJ Civil Solutions Current Project List
Coomidup Boulivard Street Scape Vasse

A recent addition to the JJ Civil Solutions Current Project List. We have been engaged by LD Total to assist with the transformation of the verges. Works include the removal of existing exposed aggregate paths, brick paving, pram ramps and kerb, and reinstating levels to new designs ready for new concrete paths, ramps, landscaping and planting. Some minor kerbing, asphalt and clearing works are also required. Works commenced at the start of August 2026 with expected completion at the end of September 2026.

Street Scape

Willmott Avenue Subdivision Margaret River

This is a two-lot subdivision involving bulk earthworks, stormwater drainage and two new crossovers consisting of flush kerb and asphalt seal. A 150mm thick gravel turnaround is also to be constructed, along with a drain basin that connects into the stormwater network.

Exsiting Site
Existing Site

Jecks Residence Driveway Busselton

The owners have grown tired of their unsealed driveway of sand and bluemetal roadbase. We have been engaged to prepare a new 150mm thick gravel driveway and parking area for their caravan and boat, ready for Malatesta Road Paving to lay a new asphalt mat. Works are scheduled to start at the end of September 2026.

Existing Site
Existing Site

Bradbury Residence Driveway Yallingup Siding

Project scheduled to start in November 2026 after the winter rains. The existing driveway and parking area will be upgraded by reworking and trimming the existing basecourse, then applying 40mm Gravel Pave with 1% red oxide asphalt at the house, and a laterite two-coat emulsion chip seal to the main 100m-long driveway.

Question Mark
Question Mark

Project Coming Soon - Busselton

Project Coming Soon - Caves Road

bottom of page